Luzon grid under yellow alert as power plants trip

MANILA — The National Grid Corp. of the Philippines (NGCP) placed the Luzon grid under yellow alert from 10 a.m. to 11 a.m. and from 1 p.m. to 4 p.m. on Thursday.

“Luzon grid is on yellow alert due to the unexpected shutdown and limited generation of some power plants, and high power demand,” the NGCP said in a text message to reporters.

According to the Department of Energy (DOE), a “yellow alert” is a condition that could plunge the grid into brownouts if the system would not be very quick in its response. It means the reserve power is low.

The NGCP said the available capacity is 11,387 megawatts (MW), while the peak demand is 10,532 MW. (PNA)

Popular

PBBM orders release of P21.47B for fuel subsidy, infra projects

By Ma. Teresa Montemayor | Philippine News Agency President Ferdinand R. Marcos Jr. has directed the Department of Budget and Management (DBM) to immediately release...

PBBM meeting with Bhutan PM to herald stronger ties

By Brian Campued “We are off to a promising start.” President Ferdinand R. Marcos Jr. hailed his meeting with Bhutan Prime Minister Tshering Tobgay as the...

Palace: Conditions for oil excise tax cut or suspension under review

By Ruth Abbey Gita-Carlos | Philippine News Agency The government is currently reviewing the conditions for the proposed reduction and suspension of the excise tax...

Over 300 Filipinos from Middle East back in PH

By Brian Campued At least 317 Filipinos affected by the ongoing tensions in the Middle East are now back in the Philippines, the Department of...