Man crushed to death by fan blade at Australian wind farm

By Agence France-Presse

A man was crushed to death by a fan blade of a wind turbine being built at one of Australia’s largest wind farms, police said Monday.

He had been working at the Golden Plains site about 130 kilometers (80 miles) west of Melbourne, a project which bills itself as Australia’s largest wind farm.

Police said the man was working at the wind farm when he was “crushed beneath a fan blade.”

The mammoth fan blades used on industrial wind turbines can weigh as much as 22 tons and measure more than 60 meters (200 feet) in length.

Images from local media showed a tractor attempting to lift the tip of a fan blade, which appeared to have toppled off a metal brace.

The state’s workplace safety watchdog said it was investigating the incident.

Popular

Corruption issues won’t affect PH chairship of ASEAN 2026 —PBBM

By Brian Campued President Ferdinand R. Marcos Jr. on Tuesday stressed that local political issues of any member state will not overshadow the regional and...

PH to raise South China Sea Code of Conduct as 2026 ASEAN chair —PBBM

By Brian Campued The Philippines is in the process of putting together the different elements where it believes the Association of Southeast Asian Nations (ASEAN)...

ASEAN, China sign free trade upgrade

By Brian Campued President Ferdinand R. Marcos Jr. on Tuesday joined fellow leaders at the Association of Southeast Asian Nations (ASEAN) for the signing of...

PBBM notes maritime cooperation as key for regional peace, stability

By Brian Campued Citing the ceasefire agreement between Hamas and Israel as well as the ongoing tensions in the West Philippine Sea (WPS) and the...