DPWH chief opens P165-M QC flood control project

MANILA, Aug. 7 — Department of Public Works and Highways (DPWH) Secretary Mark Villar led the opening of the two additional vehicular lanes on top of a completed flood control structure worth PHP165 million in Quezon City on Monday.

He said that movement of vehicles along Quezon Avenue eastbound will significantly improve as the 820.62 lineal meters additional service road over the newly constructed reinforced concrete box culvert from Timog Avenue to Scout Albano was opened to motorists.

“The flood control project, which costs PHP165 million, involves the construction of reinforced concrete box culvert that increased the capacity of Anaran Creek for effective mitigation of perennial flooding at South Triangle area particularly at Mother Ignacia Avenue and Panay Avenue,” he said in a statement.

According to the DPWH chief, the project has been completed after they implemented the 24/7 construction scheme in line with the efforts to fast-track infrastructure development.

“The old open channel of 2.40 meters width by 4.30 meters deep from Timog Avenue to Scout Borromeo Street was replaced by a reinforced concrete box culvert 5.30 meters width by 4.35 meters deep,” Villar added.

He noted that the six meters width top slab of the box culvert was converted into an additional two lanes service road.

“With the completion of Timog Avenue to Scout Albano Street segment, the project, which spans 1.1 km in total, will increase the capacity of Anaran Creek by 123.4% and decongest traffic in Quezon Avenue. It is also an alternative route to EDSA and Timog Avenue,” he explained.

On the other hand, Villar formally inaugurated the rehabilitation of the 1.2 kilometer Sergeant Esguerra Road located in Barangay South Triangle.

“We’ve expanded the existing asphalt pavement of 9.8 meters and replaced it with a concrete pavement of 14 meters. With the opening of additional two lanes, we expect traffic to ease along EDSA, Quezon Avenue and Timog Avenue,” he added. (Ferdinand G. Patinio/PNA)

Popular

Longest Traslacion ends after nearly 31 hours

By Ferdinand Patinio and Christopher Lloyd Caliwan | Philippine News Agency The grand procession or Traslacion of Jesus Nazareno officially ended at 10:50 a.m. Saturday,...

‘Project AGAP.AI’ to support students, teachers towards digitally enabled PH education system —PBBM

By Brian Campued “As we hit the ground running in 2026, once again, we start a new era in our educational system.” In line with the...

Province-wide ‘Benteng Bigas’ rollout to start in Pangasinan next week —D.A.

By Brian Campued Following the successful nationwide rollout of “Benteng Bigas Meron (BBM) Na” Program in 2025, the Department of Agriculture (DA) is set to...

D.A. assures budget transparency with ‘FMR Watch’

By Brian Campued To ensure that the budget allocated to the agriculture sector this 2026 is used for projects that will directly benefit Filipinos, the...