Meralco procures 660-MW power supply for dry season

Manila Electric Company (Meralco) personnel inspect the electric meters and power transformer on a concrete post along Cogeo Avenue in Antipolo City (PNA photo by Joey O. Razon)

By Kris Crismundo | Philippine News Agency

In preparation for higher electricity demand during the dry season, the Manila Electric Company (Meralco) has started the Competitive Selection Process (CSP) for the 660 megawatts (MW) interim power supply.

Meralco said Thursday that it has opened the bidding for the 660-MW power requirement after the Department of Energy (DOE) granted the distribution utility (DU) the Certificate of Conformity on the Terms of Reference for the Interim Power Supply Agreements (IPSAs).

The IPSAs cover Meralco’s 260-MW peaking requirement and 400-MW base load requirement for 2024, in line with its Power Supply Procurement Plan approved by the energy department.

“The 260-MW and 400-MW IPSAs will be effective until July 2024 and February 2025, respectively,” Meralco said in a statement.

The DU invited interested power generation firms to submit their Expression of Interest for both IPSAs until Jan. 15.

“The Pre-Bid Conferences for the 260-MW peaking requirement and 400-MW base load requirement are both scheduled on Jan. 22, while the Bid Submission Deadlines are set on Feb. 26 and 27, respectively,” it added.

DOE data showed that peak demand in the Luzon grid this year is projected at 13,917 MW, higher by 1,367 MW from the actual peak demand in 2023.

Popular

Discayas reveal names of politicians allegedly involved in anomalous flood control projects

By Dean Aubrey Caratiquet At the Senate Blue Ribbon Committee hearing on anomalous flood control projects this Monday, husband and wife entrepreneurs Pacifico “Curlee” Discaya...

PBBM inks law declaring protected areas in Tarlac, Southern Leyte

By Dean Aubrey Caratiquet Recognizing the need to protect landscapes and ecosystems from human activity and urban encroachment, President Ferdinand R. Marcos Jr. has signed...

Palace hits Discayas over ‘misinformation’ on PH film center project

By Ruth Abbey Gita-Carlos | Philippine News Agency Malacañang on Saturday slammed the camp of contractor couple Cezarah “Sarah” and Pacifico “Curlee” Discaya for claiming...

Eala reaches Guadalajara 125 Open finals

By Jean Malanum | Philippine News Agency Filipino tennis ace Alex Eala reached the Guadalajara 125 Open finals after beating American Kayla Day, 6-2, 6-3,...